Primavera p3 problems
Primavera p3 problems










primavera p3 problems

To avoid circular logic, the same activity could not be included in both predecessor (i.e.

primavera p3 problems

In prior software versions, hammocks were constructed by establishing a group of start-controlling activities as SS predecessors and a separate group of finish-controlling activities as FF successors. They are effectively a replacement for the “hammock” activities that existed in prior versions of Primavera products, including Primavera Project Planner (P3) and SureTrak Project Manager. Level-of-Effort (LOE) activities in Oracle Primavera P6 project scheduling software are useful for summarizing the schedule dates of other (primary) activities. This short entry demonstrates why Level of Effort activities in Oracle Primavera P6 should be constructed using predecessor successor relationships only – especially when designating Critical activities using the Longest Path algorithm. Tola on Multiple Critical Paths – Revisited with BPC Logic Filter.Tom Boyle on Multiple Critical Paths – Revisited with BPC Logic Filter.Mark Sprinkle on Macro for Filtering based on “Task Path” in Microsoft Project.Tom Boyle on Macro for Filtering based on “Task Path” in Microsoft Project.Vladimir Liberzon on Multiple Critical Paths – Revisited with BPC Logic Filter.Alternate Definitions of Driving Logic Relationships in Project Schedules.Updating the Project Schedule – Time Now and the Project Update Dialog in Microsoft Project.Multiple Critical Paths – Revisited with BPC Logic Filter.Video – Inspect and Jump through Network Logic Links Using BPC Logic Filter – LLI Edition.












Primavera p3 problems